Looking For sponser and projects support of engineering company
-
i am an architect i am going on open a new consultant engineering office in Dubai i need the following :
** sopnser (local) must be an architect or civil engineer (( annual fees ))
** persons to suport the office with projects (comessions will be paid )..
contact me immediately please mail me to the folowing e mail .... [email removed]13 Ott 2008, 09:10 Architect
Risposte
-
post tension services
Post Tension Services India Pvt. Ltd (PTSI) is a supplier of Post tensioning products and related services in India. PTSI is a joint venture between Sterling Engineering and Design Group Ltd., a USA based company with extensive post tensioning design and construction experience and Indian group. PTSI specializes in supply and installation of un-bonded mono-strand cable reinforcing in the Indian subcontinent. Our office in Vadodara is currently servicing clients in India.
We provide the following products and services:
» Unbonded PT Cables » Design of PT System » Post Construction Services
» Related Accessories » PT System Installation » Value Engineering Services
We typically review the structural design of the project with the structural engineer of record and determine the feasibility of use of P-T on the project. If P-T is deemed feasible, PTSI submits a cost proposal to provide the reinforcing and its installation to the engineer/owner. The proposal defines in detail the scope of work of PTSI. The quote typically includes providing the cost for P-T cables, all accessories, P-T System installation and its stressing. The design of the P-T is in accordance with relevant ACI and IS codes. Typically, PTSI requires 3 to 4 weeks to deliver Post Tensioned cables after receipt of order. Our experience to date in the Indian market has yielded some valuable information. On an average the following construction improvements were observed:
P-T reduced the concrete volume by 20 to 30%
Cost of reinforcing is typically 20 to 30% less than that of conventional reinforcing
Formwork can be stripped after 4-5 days
Average bay (Column) spacing is 25 to 30 feet without increase in the slab thicknessajeet singh 17 Nov 2008, 03:04 - Denuncia